Skip to content

MIRIDIA FOR MINING

The right part, at the right site, before the machine stops

When a machine stops in a mine, the failure report names a component. It rarely names the real cause: the replacement was not on the shelf, the requisition took a week to approve, or the one supplier who stocks it is a long road away.

WHAT GOES WRONG

Four places mining loses money

The part exists, but not where the machine is

A mid-size mining operation is a network of pits, plants, workshops and stores, sometimes hours apart. When each store keeps its own record, the part that would restart the crusher can sit in another site's store, invisible, while a duplicate purchase order goes out at emergency freight rates. ABB's survey of 3,215 plant maintenance decision-makers put the typical cost of unplanned downtime at 125,000 US dollars per hour.

Reorder points were set once, by the person who left

Filters, drill bits, tyres and reagents follow demand that drifts with the mine plan. The reorder points that guard them were often set years ago and never recalculated. Research by Vanson Bourne for ServiceMax and GE Digital found that 70% of companies lack full awareness of when equipment is due for maintenance, upgrade or replacement, so the demand for its parts is hidden too. The stores then hold cash in parts nobody draws and run out of the parts that stop a machine.

The requisition travels further than the part

A requisition raised at a remote site moves by email or radio to an office, waits for a signature, and is retyped into a spreadsheet before it becomes a purchase order. APQC's benchmarking puts the cost of processing a single purchase order at anywhere from about 14 to more than 54 dollars, a near five-fold gap between top and bottom performers. The processing cost is the small part. The large part is the days the machine waits while the paperwork catches up.

The storeroom is a black box with a gate

Issues are written in a notebook, receipts skip the system when the fitter is in a hurry, and nobody reconciles the record against the shelf until the year-end stocktake. Industry analysis published by Reliable Plant finds that in a typical MRO storeroom only 25 to 30% of inventory is required active stock, while half or more is inactive. The reorder logic then runs on numbers that do not exist, so duplicate stock and stockouts arrive together.

$125k the typical cost of one hour of unplanned downtime
30-60% of a mine's operating cost is maintenance

From The Part That Stops the Pit, with the source of each figure in the report.

HOW IT RUNS

From low stock to the right site

  1. 01

    Spare below reorder point

    Each spare carries a reorder point, reorder quantity and safety stock for each location. When stock falls below the threshold, Miridia raises the need automatically, and an AI Autopilot stock watcher can flag a critical line in the findings inbox.

  2. 02

    Requisition approved

    The requisition moves through an authorisation matrix with approval thresholds and department budgets. The approver acts on one record, so nothing is retyped from an email or a radio call into a spreadsheet.

  3. 03

    Purchase order sent

    Approved demand becomes a purchase order grouped per supplier, priced from the primary supplier and dated from its lead time. Freight, duties and insurance go on cost lines, so the landed cost sits on the same document.

  4. 04

    Transfer to site

    A goods received note records the ordered, received and damaged quantities at the central store. A transfer order then moves the part to site, tracked as in-transit from dispatch until the site receives it.

FROM LOW STOCK TO THE RIGHT SITE
01Spare below reorder point
02Requisition approved
03Purchase order sent
04Transfer to site
Connected by Miridia

THE PLATFORM

What Miridia does about it

  • Per-location stock across pits, plants, workshops and stores
  • Transfer orders between sites with two-phase in-transit tracking
  • Reorder points and automated purchase orders per product per location
  • Requisition-to-PO approvals with thresholds and department budgets
  • Intermittent-demand forecasting with Croston for spares and consumables
  • Multi-supplier lead times, MOQs and scorecards built from PO history

HONEST FIT

When Miridia fits, and when something else fits better

Miridia is a good fit when

  • You run several pits, plants, workshops or stores and need one stock record across all of them.
  • Critical spares and consumables run out while slow movers fill the shelves.
  • Requisitions are approved by email, radio or a signature on paper, and you want thresholds and budgets enforced on one record.
  • You have outgrown spreadsheets and want a modern ERP alternative without a multi-quarter implementation.

Choose something else when

  • You need asset registers, maintenance work orders, condition monitoring or inspection schedules. A CMMS or EAM. Miridia manages the parts, not the maintenance, and can run beside one.
  • You need mine planning, grade control, haul cycle optimisation or fleet dispatch. A mine planning or fleet management system.
  • The project is really a replacement of the general ledger and statutory reporting. An ERP or accounting system that replaces the financial core.

FREE INDUSTRY REPORT

The research behind this page

The figures on this page come from our Mining report: 15 pages, 5 figures and 10 cited sources. It includes a 90-day plan, and it names the conditions in which a different product is the better choice.

Mining industry report

The Part That Stops the Pit

Why unplanned downtime in mining and quarrying is so often a stores and procurement failure, and what to do about it.

$125k the typical cost of one hour of unplanned downtime
30-60% of a mine's operating cost is maintenance
  • 15 pages
  • 5 figures
  • 10 cited sources
  • PDF, 448 KB

QUESTIONS

Miridia for Mining: common questions

Does Miridia replace a CMMS for a mine?

No. Miridia manages the parts, not the maintenance. It has no asset register, maintenance work orders, condition monitoring or inspection schedules. It works beside a CMMS: the CMMS says what to maintain and when, and Miridia makes sure the part is on the shelf, accounted for in the ledger, and reordered from the right supplier. The API and the workflow engine can carry data between the two systems.

Can Miridia forecast spare parts with intermittent demand?

Yes. Miridia Planner backtests a pool of models for each SKU against your own consumption history. The pool includes Croston's method, which is built for intermittent demand. A champion model must beat naive and seasonal-naive benchmarks before it is trusted, and short or intermittent histories go to a reduced model pool instead of being overfitted. The forecast then drives reorder point recalculation.

How does Miridia track stock across remote mine sites?

Each pit, plant, workshop or store is a location with its own capability settings, and Remote is one of the location types. Inventory records for each location track on-hand, reserved and in-transit quantities. Transfer orders move stock between sites with a request, approval, dispatch and receipt lifecycle, and every change writes to an append-only movement ledger with a running balance and a link to its source document.

How do we see the landed cost of parts delivered to a remote site?

Purchase orders carry non-product cost lines for shipping, duties, insurance and other procurement costs, so the landed cost sits on the same document as the part. Each goods received note records ordered, received and damaged quantities, posts to the inventory ledger and updates the weighted average cost.

MAKE. MOVE. MEASURE.

See it run on your own numbers

Show us how you work today. We map it against the platform, with your own products and numbers.