PROJECT PLANNING AND JOB COSTING

What the job has cost so far, and what it will cost at the end

Miridia Projects is the project planning and job costing module of the supply chain automation platform. It plans each job in phases, prices it line by line as material, labour and other costs, and draws the material from your stock as the work uses it. The forecast cost, the forecast end date and a health flag move with every actual.

WHAT GOES WRONG

Where a job loses its margin

The quote is a spreadsheet, and the job is somewhere else

The estimate was built once, in a file. The material is bought and the hours are worked in other places, so nobody compares the two until the job is over.

You learn the overrun at the invoice

The cost of a job that runs 12% over shows up when the supplier invoices arrive and the hours are added up. By then the work is finished and the price is agreed.

Material for the job leaves the store with no job on it

A technician takes cable and fittings from the shelf. The stock count drops, and nothing says which job used it, so the job looks cheaper than it was.

A late phase moves every date after it

The first phase finishes three days late. The end date on the plan stays where it was, and the customer is promised a date that cannot hold.

HOW IT RUNS

From quote to final cost

  1. 01

    Set up the project

    Name the customer, the site and the manager, and set the budget and the contingency. Add the phases, each with planned dates.

  2. 02

    Price each phase

    Add cost lines to each phase as material, labour or other. A labour line holds its hourly rate, and a material line names the product from your catalogue.

  3. 03

    Record the actuals

    Record the hours, the other costs and the material used. A material actual takes the stock out of inventory in the same step, so the stock and the job always agree.

  4. 04

    Watch the forecast

    The planned cost, the actual cost, the forecast at completion, the variance against the budget and the forecast end date are live. The project shows On track, Watch or At risk.

FROM QUOTE TO FINAL COST
01Set up the project
02Price each phase
03Record the actuals
04Watch the forecast
Connected by Miridia

THE PLATFORM

What Miridia does about it

Projects with a budget and a contingency

Each project has a customer, a site, a manager, a budget and a contingency. The budget is the number that the forecast is measured against.

Phases with planned and actual dates

Split a job into phases with planned and actual dates and a progress figure. Move the dates of a phase, and the forecast end date of the project follows.

Material, labour and other cost lines

Plan each phase in cost lines. A material line names a product, a labour line holds its rate, and an other line carries anything else that the job costs.

Actuals that move stock

Record an actual against a cost line. A material actual draws the stock from inventory in the same step, with the movement on the ledger and the job on the movement.

A forecast at completion

Miridia takes the actual cost, adds the planned cost of the work that remains, and adjusts it by how the finished phases ran against plan. The variance against the budget updates as you record.

A health flag for each project

A project is At risk when its forecast cost passes the budget, and on Watch when more than half of the contingency is used. Filter the portfolio by health to see which jobs need a call.

A portfolio list and a timeline

List every project with its budget, its forecast and its health, or switch to a timeline that shows every open project on one Gantt chart.

A project page that shows the cost curve

Each project has a timeline of its phases and a cumulative cost chart, with the actual cost and the forecast on one date axis.

Linked work orders

A job that needs a fabricated part links to the work order that makes it. The work order stays a normal work order, with its bill of materials and its stock movements.

Activity, comments and attachments

Every change is on the activity record of the project. Add comments and attach quotes, photos and site notes to the project itself.

HONEST FIT

When Miridia fits, and when something else fits better

Miridia is a good fit when

  • You sell jobs, not units: installations, fit-outs, repairs, maintenance contracts or fabricated one-offs.
  • A job has phases, a budget, and material that comes from your own stock.
  • You price from a quote, and you want to see the overrun while the job is still running.
  • You have 5 to 500 staff, and you keep your books in an accounting package.

Choose something else when

  • You need drawings, requests for information, progress claims and retentions. A construction project management system
  • You need payroll, timesheet approval and leave. A payroll and workforce management package
  • Your work is a production run of one product from a recipe. Work orders and bills of materials in Miridia Core

QUESTIONS

Project Planning and Job Costing: common questions

What is Miridia Projects?

It is the project planning and job costing module of Miridia. A project has phases, cost lines for material, labour and other costs, and actuals. It gives a live forecast of the cost and of the end date.

Does recording material on a project change my stock?

Yes. A material actual draws the stock out of inventory in the same step. The movement is on the ledger with the project on it, so the stock count and the cost of the job agree.

How does Miridia forecast the cost of a project?

It adds the actual cost to the planned cost of the work that remains, and adjusts that figure by how the finished phases ran against their plan. The variance against the budget is the forecast minus the budget.

What do On track, Watch and At risk mean?

A project is At risk when its forecast cost is above its budget. It is on Watch when more than half of its contingency is used. Otherwise it is On track.

How is a labour cost set?

Each labour cost line holds its own hourly rate. Hours that you record against the line are costed at that rate.

Can a project use work orders?

Yes. A project links to the work orders that make parts for it. The work orders keep their bills of materials and their stock movements.

Is Miridia Projects part of the base plan?

It is an add-on to your subscription, like Miridia Flows. Book a consult and we will show it on your own jobs.

MAKE. MOVE. MEASURE.

Cost one of your own jobs

Bring a recent quote and what the job cost in the end. We load it into a demo account and show where the forecast would have warned you.